Self-Standing, Self-Supporting, Rapid-Deployment Tower Site Requirements:

· No Site Excavation, Foundation Forming or Rebar work Required

· No Concrete Pouring

· Only Requires Semi-Level Ground within tower base boundaries (+3” from corners)

· Suggest a surface layer of 4” (or more if needed) of gravel or road-base for leveling, drainage and stability - not
required (depends on soil and ground slop)

· Because Tower is not constructed or mounted to a permanent foundation, permits may not be required or greatly
reduced.

Copyright © 2014, 2017 by Adaptive Communications LLC  ·  All Rights reserved